The prototype versions of what will hopefully be used to create a sound reducing pocket park along the green corridor is complete. After placing the daub (a mixture of clay, sand, straw and water) on the pallets, we waited till they were dry and installed them in their temporary locations.
First we had materials delivered to us by PCR Contractors, the group building the new engineering building. They gave us a good helping of clay, sand, rocks and a bale of straw.
Then we began to mix.
After the daub was mixed we were able to apply it to the pallets, let them dry, then install them. All went according to plan, now they need to be tested for sound canceling ability.